So, on the 5th (the 5th day of the month and also the 5th day of work but not really because of the hell day that was supposed to be the 5th day but was really the 4th and a half or the 5th part 1- see?) dy I did some little stuff and lifted the containers onto the roof.
I installed the sliding doors on the back side of the storage section using the two door cutouts, screwed around with the SIPs on the roof, changing the pitch and position, temporarily covered the roof SIPs with asphalt felt paper so that they would be protected in case of rain (it hasn't rained a drop but I nearly caught on fire myself in the heat on the roof) and just screwed around. I also hung some more joists in the center section, blah blah blah...
I have 3 young, strong men coming to put the hammer down on getting this thing close to completion on the 18th of July. We'll work for 4 days and install the SIPs on the side, the metal over the SIPs, get the roof in it's final position, finish hanging joists and build the front porch. At least that's the plan.
You can see pictues of me lifting the roof SIPs and some other minor stuff HERE
Why a different site for photos? Unfortunately, this blog is hosted by Typepad and Typepad has a really crappy interface for uploading photos from a Mac. It will not batch upload and it takes forever. Therefore, I have chosen to use the alternate site to host the photos because it is a Mac site and easy to do.
That's all- This feels like homework..... I will try to do more if the urge overtakes me.